Engineering & PMC Noise Modeling — KSA

De-risk engineering reviews—simulate noise early and cut rework

Transport corridors, mixed-use masterplans, and industrial layouts—all BIM/GIS exchange ready with auditable assumptions.

Integration points

  • BIM/GIS handoff specs for planners and designers
  • Gateway checks at concept, schematic, and detail design
  • Scenario deltas for optioneering and value engineering
  • Standardized outputs for internal and client reviews
  • Clear audit trail for approvals and change control

Workflow

  • Import BIM/GIS and terrain; align coordinate systems
  • Define sources, barriers, façades, receivers
  • Run scenarios; compare deltas and risks early
  • Export maps, tabular results, and report packs
  • Archive assumptions for QRA/permit submissions

Training & support

Arabic/English onboarding; Sun–Thu 09:00–17:00 (AST). WhatsApp and email support.

خفّض مخاطر المراجعات الهندسية—حاكِ الضوضاء مبكراً وقلّل إعادة العمل

ممرات النقل، المخططات متعددة الاستخدامات، والتخطيطات الصناعية—تكامل كامل مع BIM/GIS وفرضيات قابلة للتدقيق.

نقاط التكامل

  • مواصفات تسليم/استلام مع BIM/GIS للمهندسين والمخططين
  • نقاط تفتيش عند المفهوم والتصميم الأولي والتفصيلي
  • فروقات السيناريوهات لاختيار البدائل والهندسة القيمية
  • مخرجات قياسية لمراجعات داخلية ومع العملاء
  • مسار تدقيقي واضح للاعتمادات وإدارة التغييرات

سير العمل

  • استيراد BIM/GIS والتضاريس؛ توحيد أنظمة الإحداثيات
  • تعريف المصادر والحواجز والواجهات ونقاط الاستقبال
  • تشغيل السيناريوهات ومقارنة الفروقات والمخاطر مبكراً
  • تصدير الخرائط والنتائج والجداول وحزم التقارير
  • أرشفة الفرضيات لتقديمات التصاريح/التقييم

التدريب والدعم

تدريب بالعربية/الإنجليزية؛ الأحد–الخميس 9:00–17:00 (AST). دعم عبر واتساب والبريد.